MY词语>英语词典>lock chamber翻译和用法

lock chamber

英 [lɒk ˈtʃeɪmbə(r)]

美 [lɑːk ˈtʃeɪmbər]

网络  闸室

英英释义

noun

  • enclosure consisting of a section of canal that can be closed to control the water level
      Synonym:lock

    双语例句

    • Being a sophisticated spatial structure system conventional methods in mechanics of materials and structural mechanics find difficulty in describing the real burdening situation of lock chamber, and presents embarrassment in designing.
      泄水闸室属于一种复杂的空间结构,传统的材料力学和结构力学方法计算难以真实的反映其受力状态,必然给设计工作带来一定的困难。
    • Through optimizing the operation parameters of conveyance water lock of TGP, the condition of ships'staying for lockage in the first chamber is met;
      通过优化三峡船闸输水阀门运行参数,满足了船舶在一闸室待闸的停泊条件;
    • This paper introduces the technology of anti-seepage treatment on structural joints in the fourth lock chamber northern in TGP's permanent lock, mainly states the technique and material used in project as well as construction process.
      本文介绍了三峡永久船闸北线四闸室结构缝防渗处理工程中处理的工艺、使用的材料、施工的过程。
    • Investigations on the oxygen contamination in the μ c-Si ∶ H thin films deposited by very-high-frequency plasma-enhanced chemical-vapor deposition ( VHF-PECVD) technique with and without load lock chamber have been reported in this paper.
      对不同的本底真空条件下,采用甚高频等离子体增强化学气相沉积技术沉积的氢化微晶硅(μcSi∶H)薄膜中的氧污染问题进行了比较研究。
    • Application of Monte-Carlo Method in Reliability Analysis against Sliding for Gate Lock Chamber
      蒙特卡罗法在水闸闸室可靠度分析中的应用
    • The Analyses and Research on the Ultimate Bearing Capacity of Soil Layer Anchor Rod in Lock's Chamber Structure
      船闸工程土层锚杆的变形及设计承载力分析研究
    • The realizable κ~ε turbulent model was used to carry out the unsteady calculation about the simulation system which was composed by batch handling lock hopper and scrubbing cooling chamber. The result of numerical simulation agrees well with the operation value.
      在由间歇排渣型锁斗和洗涤冷却室组成的模拟系统中,应用Realizableκ~ε湍流模型进行了非稳态计算,得到的计算结果和实际情况比较吻合。
    • Hydraulic study of valve with extra long emptying culvert of the Three Gorges Lock's last chamber ( 3)& Measures improving the valve working conditions with emergent valve closing
      三峡船闸末级闸首超长泄水廊道中阀门水力学关键问题研究(3)&事故动水关闭情况下改善阀门工作条件的措施
    • While FEM, which is more fine and accurate, is rarely applied to the structural calculation of lock chamber wall.
      而作为精确求解的有限元法在船闸闸室墙结构计算中应用较少,其关键在于正确地建立一套与之相适应的有限元前、后处理模型。
    • Analysis of vibrating effect of blasting demolition of spillway lock chamber near dilapidated house
      危房附近溢洪道闸室的拆爆振动效应分析